Delfins

Consultation with the rental manager

Posted on in Delfins by Sunwise.

Sunwise MolenbeekIn the E-type penthouse consultation takes place on a 'high level'. The rental agent of Sunwise discusses the finishing and furnishing level of the apartments with the the developer.

The kitchens are installed

Posted on in Delfins by Sunwise.

KitchensIn phase 1 of Pavilion 2, say the east side of the building, the kitchens are installed and currently the team has begun placing the bathroom interiors. A team flown in by the supplier Koetse, helps our construction team to deliver the best possible quality.

The lift installations...

Posted on in Delfins by Sunwise.

Elevator shaftThis week the specialists of Otis Lifts continued with the installation of elevators. The shafts are prepared to let the elevator cages go silently up and down soon.

Further development

Posted on in Delfins by Sunwise.

DelfinsThe eventual set-up of the entire resort is getting firmer contours. Most likely there will be built two pavilions (Pavilion 2 is almost ready), a restaurant, a diving center and a pool. After the completion of Pavilion 2, these 24 apartments will be rented out 'long term' for approximately two years.

The shutters are installed...

Posted on in Delfins by Sunwise.

ShuttersThe shutters are placed in their frames and next week the floor tiles will be laid. After that we put the bathrooms and kitchens in all the apartments. It is going fast now!

Scaffolds away!

Posted on in Delfins by Sunwise.

WindowsThe scaffolds were removed and the finishing can begin. The rest of the window frames, balustrades, terraces... The construction is already getting that look of the beautiful apartment building it's going to be!

The facade of the building

Posted on in Delfins by Sunwise.

FacadeThe facades are in place and now that job is done, the windows are being installed into the facades and walls.

Making progress!

Posted on in Delfins by Sunwise.

DelfinsThe construction team has made progression with the structural work of the building. Within a few weeks, a start can be made with the façade of the building and then placing the window frames.